How We Work

Your project. Visible at every stage.

From drawings to dispatch, we keep the project moving through shared information, clear checkpoints and direct feedback. Chenyu Huang is your point of contact throughout.

FULL-PROCESS VISIBILITY & COMMUNICATION

A clear conversation, even when you’re far away.

01

Project information shared

Relevant progress, drawings, material images and inspection information are shared at agreed stages.

02

Feedback coordinated

Chenyu Huang brings your questions and changes to the right factory team and follows the response through.

03

Changes made clear

Material, drawing, scope or programme changes are discussed and recorded for confirmation.

04

Issues followed through

Concerns are reviewed with the factory, with findings and agreed actions communicated back to you.

THE PROJECT PROCESS

What you see, at each stage.

01 / THE PROJECT PROCESS

Drawings & project scope

Review the application, stone, geometry, quantities and project dates before defining the supply scope.

What you receive

Technical questions, scope clarification and the information needed for production planning.

Your review & feedback

Confirm requirements and resolve drawing questions with the project team.

Process imagery; stages shown are separate examples.

PROCESS EVIDENCE / MATERIAL & LAYOUT

A real slab becomes a layout you can review.

Every slab has its own natural pattern. Scanning captures the actual material, QR-linked records identify the slabs, and digital layout helps plan the pattern before the physical dry lay.

Slab scanning · process reference
Layout and piece identification · process reference
Physical stone layout in the factory

Independent process references, rather than before-and-after views of one project.

  1. 01

    Actual slab scan

    Capture the real pattern and material information.

  2. 02

    Layout review

    Plan the arrangement using the scanned slabs.

  3. 03

    Factory dry lay

    Lay out the finished pieces and review the overall effect.

  4. 04

    Numbered pieces

    Identify each component for installation in the confirmed arrangement.

02 / QUALITY ASSURANCE

Know what will be checked.

Define the requirements before production. Review the material and layout, follow fabrication checks, and see the dry lay before dispatch.

01

Before production

Confirm drawings, material references, finishes and the inspection criteria for your order.

02

During fabrication

Review agreed inspection records and flag details that need clarification or adjustment.

03

Before dispatch

Check the factory dry lay and piece identification against the agreed layout.

Acceptance criteria, quality responsibilities and applicable warranty terms are confirmed for each order.

QUALITY RESPONSIBILITY & FOLLOW-UP

Quality questions have a clear route.

Agree the inspection and acceptance criteria, quality responsibilities and applicable warranty terms for your order. If a concern arises, share the piece reference and supporting details with Chenyu Huang for factory review and follow-up.

Discuss your project
START WITH YOUR PROJECT

Bring the drawings. Let’s review the details.

Share your material, quantities, project location and required dates. Chenyu Huang coordinates the next conversation with the factory.

Send project drawings